Scale of Rates
(With effect from 01st August 2015)
DEFINITIONS
Company shall mean Ennore Tank Terminals Private Limited (ETTPL) registered under the Companies Act, 1956.
Day shall be reckoned from 6.00 a.m. to 6.00 a.m.
Coastal Vessel means a vessel which is engaged in the carriage by sea of passengers or
goods from any port or place in India to any other port or place in India. The status of the
vessel as borne out by its certification by the Customs or the Director General of Shipping
shall be the deciding factor for its certification as "coastal" or "foreign going" for the purpose
of levy of vessel related charges.
Entry means entering into the Port limits.
Foreign Vessel means a vessel engaged in trading between any port or place in India and
other port or place or between ports or places outside India.
Gross Tonnage (GT) is the cubic capacity of the whole ship including engine room and crew space but excludes space above deck, cabins, and deck shelters, chart houses etc and as recorded in the Certificate of Registry of the vessel.
Pipeline Charges shall mean the charges payable for usage of pipelines of ETTPL Trestle,
Pipeline and Unloading Arm/Hose Connection Charges shall mean a composite charge payable for usage of pipeline trestle and pipeline(s) of ETTPL and for services of ETTPL for unloading at the Marine Liquid Jetty.
Trestle Charges shall mean the charges payable for using the pipeline trestle of ETTPL.
Wharfage shall mean the basic dues recoverable on all cargo imported or exported or transshipped or passing through the Marine Liquid Terminal-1. |
CONDITIONS
- All charges notified hereunder in various Chapters in terms of U.S. Dollars shall be
levied for all Foreign Vessels and Indian Vessels engaged in Foreign Trade. The
charges shall be collected from the Owners / Agents in Indian Rupee converting U.S
Dollars Rates at market TT buying Rates notified by Punjab National Bank as on
date of arrival of the vessel.
- A regular review of the exchange rate shall be made once in thirty days from the date
of arrival of the vessels in case of vessels staying in the port for more than thirty
days. In such cases the basis of billing shall change prospectively with reference to
the appropriate exchange rate prevailing at the time of review.
- The fraction of a Rupee so arrived at will be rounded off to the next full Rupee.
- Vessel related charges for coastal vessels shall be recovered at the rates notified
in Rupees only.
- The charges for services and usage of equipments not mentioned in the Scale of
Rates are as per agreement between the Company and the user requiring such
services.
- Rates in respect of goods to be landed shall be payable prior to / immediately on the
landing of the goods and rates in respect of goods to be removed from the premises
of the Company, or to be shipped for export, or to be transshipped, shall be payable
before the goods are so removed or shipped or transshipped.
- For the purpose of Scale of Rates
1. One unit by weight means 1 Metric Tonne (1000 kilograms).
2. One unit by capacity/volume measurement for certain liquids in bulk means 1 Kilo
Litre (1000 Litres).
- In calculating the Gross weight or measurement by volume or capacity of any
individual item, fraction up to and including 0.5 shall be taken as 0.5 and fractions
over 0.5 shall be taken as one unit.
- It shall be the primary responsibility of the party filing the Import/Export Application to
declare the correct unit and/or units on the application at the time of filing. In case the
required units or units not being available in the relative shipping documents, the
party shall actually weigh and/or measure the consignment and then declare the
same on the Application before filing with the Company. Any under-declaration
and/or under-statement found at the time of test check by the Company will involve
the party liable for the penalty.
- All the charges payable to the Company, as per this Scale of Rates shall be paid by
way of a crossed DD / Banker's Cheque in favour of "Ennore Tank Terminals Private
Limited", payable at Chennai before the vessel is berthed based on estimates. The
difference between the actual and the estimates shall be settled within two business
days.
- The Charges payable directly to M/s.Kamarajar Port Limited (other than those listed in
this scale of rates) such as Pilotage-cum-towage, Port dues, etc shall be as per the
Tariff published by M/s.Kamarajar Port Limited
- The Scale of rates are subject to changes without any prior intimation and shall be
valid and binding from the date mentioned therein.
- The Company's decision shall be final in case of any differences in the interpretation
of any terms or conditions in this Scale of Rates.
- The charges for usage of storage and allied facilities & services provided by the
Company are not covered in this Scale of Rates and the same shall be as per agreed
terms with the users.
- The berthing of vessels shall be as per Berthing Policy annexed with this scale of
rates. The decision of ETTPL shall be final for such berthing and ETTPL shall not be
liable or responsible for any demurrage or claim or loss on any grounds whatsoever.
For avoidance of doubt, it is clarified that the channel access shall always remain
with M/s.Kamarajar Port Limited.
- Service Tax / Other Taxes / Duties / Levies / Cess / Surcharge etc. shall be charged
extra as applicable.
- The Company shall have the right to shift (or) pull out a vessel or instruct the port to
shift or pull out a vessel berthed at the Company's Jetty in case of:
1) Any problem noticed with the vessel and/or
2) Unable to start pumping within the stipulated time or prolonged intermittent
stoppage due to pump problem in the vessel.
3) On Safety grounds
In such an event, all the costs / de-berthing and re-berthing charges including
demurrage shall have to be borne by the vessel (or) the Port user. Company shall
have the right to exercise the option of shifting or pulling out a vessel under sub
clause (1) and (2) above, in order to minimize berthing delays of vessels in the outer
anchorage, if any.
- Users whose tank farm/facility are connected by Pipelines to ETTPL's Common
manifold should bring the cargo/product(s) in their own name only.
|
VESSEL RELATED CHARGES
BERTH HIRE CHARGES - MARINE LIQUID BERTH
|
- Berth Hire charges will be charged on the basis of the Gross Tonnage (GT) of the
vessels and for a minimum of 12 hours.
- For a vessel carrying deck cargo, the deck cargo will be added to the Gross Tonnage
of the vessel for determining the Gross Tonnage on which the charges are to be
calculated.
- For a vessel having a dual tonnage, the higher tonnage will be taken into account for
calculation of all vessel related charges.
|
Rate per Gross Tonnage per hour or part thereof |
Applicable to port users having service
agreement w.r.t. specified services for
vessel related charges
|
For other port users not having service
agreement w.r.t. specified services for
vessel related charges |
Coastal Vessel
(in Rs.) |
Foreign vessel
(in USD) |
Coastal Vessel
(in Rs.) |
Foreign vessel
(in USD) |
As per agreed rate |
As per agreed rate |
0.86
(minimum Rs. 4300/-per Hour) |
0.021
(minimum USD 105 per Hr) |
Coastal Barges(in Rs.) |
|
Coastal Barges(in Rs.) |
|
As per agreed rate |
|
0.86
(minimum Rs. 860/- per
Hour) |
|
|
|
Note:
Any vessel which continues to occupy berth after the expiry of the time indicated in the notice served
on the vessel to vacate the berth shall pay additional berth hire charges at the following rates. The time
to be calculated from the expiry of the notice period till the vessel vacates the berth.
- For the first two days - At four times the rate of the berth hire charges for authorized
occupation (subject to a minimum of USD 420 per Hour in case of Foreign Vessels and
Rs.18000/- per hour in case of coastal vessels).
- For third day and for subsequent days - At six times the rate of berth hire charges for
authorized occupation (subject to a minimum of USD 630 per hour in case of Foreign Vessels
and Rs.27000/- per hour in case of coastal vessels).
- The additional berth hire charges shall be in addition to normal berth hire charges payable
under the schedule.
- Other Vessel related charges and charges for services provided by M/s.Kamarajar Port Limited
are payable to Kamarajar Port Limited directly as per their scale of rates.
- A penal berth hire charges equal to one day's berth hire charge shall be levied for a False Call
for Pilot. 'False Call for Pilot' means when vessel is not ready in all respects but has called for
pilot and after boarding the vessel, the Pilot could not sail the vessel, as it was not ready
resulting in disembarkation of the pilot from the vessel without sailing / shifting.
- Company shall have the right to arrange for vacation of the vessel from the berth at the cost of
the vessel and/or the user as the case may be, in event of any of the following:
a) Failure of a vessel to commence pumping operations due to problems in the vessel
b) Non- commencement or stoppage of discharge by the vessel due to
c) i) nature of products or
ii) instructions from the person other than the company or
iii) awaiting clearance viz Statutory or otherwise.
d) Pumping rates are lower than the normally acceptable pumping rates.
In such an event, all the liabilities that would arise shall be borne by the Vessel/the user
|
|
S. No. |
Product |
Unit |
Rate |
1. |
Carbon Black Feed Stock |
Per Metric Tonne |
Rs.90.00 |
2. |
Edible Oil |
Per Kilo Litre |
Rs.90.00 |
|
S.No. |
Product |
Unit |
Rate |
1. |
Furnace Oil |
Per Kilo Litre |
Rs.100.00 |
2. |
Lube Base Oil |
Per Kilo Litre |
Rs.100.00 |
3. |
Solvent Naphtha |
Per Kilo Litre |
Rs.125.00 |
4. |
Hexane |
Per Kilo Litre |
Rs.125.00 |
5. |
Iso Propyl Alcohol |
Per Kilo Litre |
Rs.125.00 |
6. |
Benzene |
Per Kilo Litre |
Rs.125.00 |
7. |
Styrene Monomer |
Per Kilo Litre |
Rs.125.00 |
8. |
Toluene |
Per Kilo Litre |
Rs.125.00 |
9. |
Linear Alkyl Benzene |
Per Kilo Litre |
Rs.125.00 |
10. |
Acetone |
Per Kilo Litre |
Rs.125.00 |
11. |
Normal Paraffin |
Per Kilo Litre |
Rs.125.00 |
12. |
Methyl Ethyl Ketone |
Per Kilo Litre |
Rs.125.00 |
13. |
Mixed Xylene |
Per Kilo Litre |
Rs.125.00 |
14. |
Cyclo Hexanone |
Per Kilo Litre |
Rs.125.00 |
15. |
N. Butanol |
Per Kilo Litre |
Rs.125.00 |
16. |
Butyl Acetate |
Per Kilo Litre |
Rs.125.00 |
17. |
Sulphuric Acid |
Per Metric Tonne |
Rs.125.00 |
18. |
Caustic Soda Lye |
Per Metric Tonne |
Rs.125.00 |
19. |
Acetic Acid |
Per Metric Tonne |
Rs.125.00 |
20. |
Mono Ethylene Glycol |
Per Metric Tonne |
Rs.125.00 |
21. |
Ethylene Dichloride |
Per Metric Tonne |
Rs.125.00 |
22. |
Mono Propylene Glycol |
Per Metric Tonne |
Rs.125.00 |
23. |
Polyol |
Per Metric Tonne |
Rs.125.00 |
24. |
Hydrated Phenol |
Per Metric Tonne |
Rs.125.00 |
25. |
Methyl Choloride |
Per Metric Tonne |
Rs.125.00 |
S. No. |
Product |
Unit |
Rate |
1. |
Propylene Oxide |
Per Kilo Litre |
Rs.210.00 |
Note: Any chemical not covered will be charged @ Rs.125 per KL
|
|
S.No. |
Product |
Unit |
Rate applicable to port users having service agreement w.r.t specified services for Cargo related charges |
Rate applicable to other port users not having service agreement w.r.t. specified services for Cargo related charges |
1. |
Motor Spirit (at 15deg C) |
Per Kilo Litre |
As per agreed rate |
Rs.100.00 |
2. |
High Speed Diesel (at15deg C) |
Per Kilo Litre |
As per agreed rate |
Rs.100.00 |
3. |
Superior Kerosene Oil (at 15deg C) |
Per Kilo Litre |
As per agreed rate |
Rs.100.00 |
4. |
Aviation Turbine Fuel (ATF) - (at 15deg C) |
Per Kilo Litre |
As per agreed rate |
Rs.100.00 |
5. |
Refrigerated-Propane, Butane, LPG |
Per Metric Tonne |
As per agreed rate |
- |
|
S.No. |
Product |
Unit |
Rate |
1. |
Motor Car |
Per car |
0.45% Ad valorem on FOB EnnorePort |
The wharfage for other products shall be published in due course.
S.No. |
Product |
Unit |
Rate |
1. |
STS Operation of Fuel Oil including bunker |
Per Tonne |
Rs.100/- |
|
Terms and conditions for Wharfage
In respect of Bulk cargoes the dues shall be recovered on the manifested tonnage/KL or
Shore Outturn Quantity in tonnage/KL whichever is higher.
In case of any clarification as to the classification of any goods, it shall be referred to the
Board of Directors of the Company whose decision shall be final.
Charges for any other services not mentioned above shall be determined at the time
of providing the services.
|
COMPOSITE TRESTLE, PIPELINE, UNLOADING ARM / HOSE CONNECTION CHARGES:
Composite Trestle, Pipeline and Unloading arm / Hose Connection Charge is
payable in addition to other charges for cargoes that are carried or transported
through the trestle and multiproduct / common user pipelines directly in to the
user owned Storage Terminal(s).
- In case payment of pipeline charges are separately determined in terms of a
specific pipeline agreement(s) with users, tariff shall be as per agreed rate.
- (iii) The above Trestle, Pipeline, Unloading Arm / Hose Connection charge is included
in the Basic Operating Charges for those users using the storage facilities of
ETTPL and hence the following tariff is not applicable to such users using the
Marine Liquid Terminal Storage facilities of ETTPL.
|
CHARGES:
Dia of the Pipeline |
Product |
Unit |
Composite Trestle, Pipelines, Unloading Arm / Hose Connection charges applicable to port users having service agreement w.r.t. specified services for Cargo related charges |
Composite Trestle, Pipelines, Unloading Arm / Hose Connection
charges applicable to other port users not having service agreement w.r.t. specified services for Cargo related charges |
12" dia and above
non insulated Mild
Steel Common
user/product
Pipeline |
Motor Spirit, High
Speed Diesel,
Superior
Kerosene Oil &
Aviation Turbine
Fuel |
Per KL |
As per agreed rate |
Rs. 75/- |
|
Refrigerated-Propane, Butane, LPG |
- |
As per agreed rate |
- |
The above charges shall be collected on the manifested tonnage/KL or Vessel Discharge
tonnage/KL, whichever is higher and subject to the terms published in this tariff.
In case of any clarification as to the classification or quantity of any goods, it shall be referred
to the Board of Directors of ETTPL for decision and the decision of the said Board shall be
final.
Other Terms:
The charges under this chapter are for the services of ETTPL rendered from MLT-1
Jetty to the common manifold of ETTPL.
COMPOSITE AIR PIGGING CHARGESINCLUDING PIG & AIR COMPRESSOR CHARGES
(Applicable for Pigging Operations from Jetty to Common Manifold of ETTPL)
- Air Pigging Charges including Pig & Air Compressor Charges are payable in
addition to other charges for cargoes that are carried or transported through the
trestle and multiproduct / common user pipelines directly in to the user owned
Storage Terminal(s) (outside ETTPL's Storage Terminal)
- (ii)Users whose tank farm/facility are connected by Pipelines to ETTPL's Common
manifold should bring the cargo/product(s) in their own name only.
- (iii)The Charges for pigging, pig and air compressor are either included in the Basic
Operating Charges or charged separately under separate terms and conditions
for those users using the storage facilities of ETTPL and hence the following tariff
is not applicable to such users using the Marine Liquid Terminal Storage facilities
of ETTPL.
CHARGES:
Diameter of the Pipeline |
Product |
Unit |
Composite Air
Pigging including Pig
& Air Compressor
Charges applicable to
port users having
service agreement
w.r.t. specified
services for Cargo
related charges |
Composite Air
Pigging including Pig
& Air Compressor
Charges applicable to
other port users not
having service
agreement w.r.t.
specified services for
Cargo related charges |
12" dia and above
non insulated Mild
Steel Common
user/product pipeline |
High Speed Diesel |
Per Pigging (Air) |
As per agreed rate |
Rs.25,000/- |
Motor Spirit |
Per Pigging (Nitrogen column followed by air) |
As per agreed rate |
Rs. 50,000/- |
The above charges are payable in advance prior to the pigging operation depending upon
the number of pigging operations required.
In case of any clarification, it shall be referred to the Board of Directors of ETTPL for decision
and the decision of the said Board shall be final.
Other Terms:
The charges under this chapter are for the services of ETTPL rendered from MLT-1
Jetty to the common manifold of ETTPL. |
|
OTHER CHARGES
|
VOM |
Coastal Vessel |
Foreign Vessel |
1. Usage of Gangway
(MOT ladder) by the
vessel, using vessel's
crane. |
Per Operation |
Rs.5000 |
USD 110 |
2. For Usage of Reducers |
Per shipment/ per
reducer |
Rs. 1500 |
USD 30 |
|
STORAGE & ALLIED CHARGES
The charges applicable for storage & other allied services such as Basic operating charges
(which is inclusive of trestle, pipeline and Unloading Arm / Hose connection charge), Pigging
charges, handling charges, weighment charges, additional throughput charges, overtime
charges, cleaning charges, transfer charges and charges for any other service as required
by the users from time to time shall be levied. The charges mentioned are excluding service
tax and other levies imposed by the Government. The above charges shall be determined
based on the following factors:
- Size of storage facilities
- Material of construction of storage tanks
- Number of tanks required / total capacity required
- Period of contract
- Special / specific / additional facilities / equipments
- Nature of product
- Payment terms
- Specific safety/handling requirements
- Health hazards
- Turnarounds
- Dock line requirement
- O&M requirements, etc
Based on the above factors, the rates shall be arrived at and will be reflected in individual
contracts / agreements entered into with respective users.
The pigging charges as stated above shall vary depending on the requirement of individual
users and / or different products and / or types and size of pipelines and hence the rates for
such services shall be determined based on mutually agreed terms.
The charges/rates pertaining to the storage and allied services cannot be published as the
facilities are custom-made to suit the requirements of individual users. |
Requirements for Vessels berthing at MLT
1. Purpose
To ensure that there are:
- structured and transparent documented guidelines for allocation of berth(s)
to vessels calling at ETTPL
- rules for efficient operations
2. Pre-Arrival Requirements
- The vessel should have sent her Q88 to ETTPL to confirm suitability for
berthing, when calling for the first time. The vessel should update ETTPL
if there is any change to the Q88 previously provided.
- Every vessel shall give 7 day / 5 day / 3 day / 2 day / 1 day Notice of Estimated
Time of Arrival (ETA) and Arrival Notice to ETTPL (email id
:etaettpl@imc.net.in) to discharge or load. The Notice will be revised if
there is a difference of more than 2 hours in ETA from the previous ETA.
- If the sailing time is less than the periods of Notice above, then, the Notice
shall be given as early as possible but in no case will it be less than 3 days.
3. Berthing Sequence
The berthing sequence shall be, as far as possible, on First Come First Serve
(FCFS) basis except as provided in these rules. With a view to ensure adherence
to the principles of equity and to ensure that every user is treated fairly, the
following rules are applicable in arriving at the berthing sequence:
- Vessel will be considered "Arrived for Berthing (FCFS)"at ETTPL if :
- Pre-arrival requirements have been met.
- She has physically arrived within the Port Limits of Kamarajar Port
and registered with the Port Signal Station giving all particulars.
- Vessel has complied with all the statutory requirements applicable
from time to time and the vessel owner/agent is on record, declaring
compliance to that extent.
- The receivers/customer has furnished to ETTPL a declaration stating
the adequacy of ullage in shore tanks on the projected berthing date,
for the entire quantity to be discharged without interruption.
- For vessels scheduled to load products, the exporter has declared to
ETTPL that the entire quantity to be loaded is available in storage
tanks in addition to the minimum quantity to be maintained in the tank,
on the projected date of berthing.
- Customs Duty on the Products (if applicable) shall be paid at least 24 hours
before pilot boarding. Alternatively, the cargo interests shall have a valid
"bonding" permit before pilot has been called. The same shall be intimated to
ETTPL in writing.
- There shall not be any overdue payments on any account to ETTPL. ETTPL
shall have received at least 24 hours in advance from Vessel
owner/agent/customer all charges payable to the Port / ETTPL and there
should be no dues outstanding. The vessel shall not be considered for
berthing and will move to the bottom of the queue, if this provision has not
been complied with.
- In order to minimize vessel waiting time at anchorage, ETTPL may decide to
berth 2 vessels at the same time, whenever possible. In such a case, one of the
2 vessels shall be first in the queue as per FCFS. The other vessel which will
be berthed will be construed as berthing in line with FCFS. ETTPL at its
discretion may decide the sequence of berthing of 1st and 2nd vessels when both
vessels are to be berthed alongside. In cases where shifting of the vessel
already at berth is involved, then, the 2nd vessel shall bear the shifting charges,
as applicable.
- If for any reason a vessel does not berth when it is her turn to berth, then, she
will go to the bottom of the queue and be the last vessel amongst those which
have already arrived. She will have to give the 3 day/2 day / 1 day Notice of
Readiness again, whenever she is expected to be ready.
- Swapping of vessels waiting for berth will be permitted only if the owners of
the cargo are the same or if there is mutual concurrence and if the expected
discharge times are the almost the same.
- Pre-discharge or pre-loading waiting at berth will not exceed 3 hours. If the
vessel waits for more than 3 hours then Penal Berth Hire will be applicable.
- Product owners will make all efforts for the sampling of products at anchorage
to get the products can be tested in the shore laboratories prior berthing.
- Vessels will not wait at berth for more than 2 hours after completion of
discharging or 3 hours after completion of loading, except due to Pilot
boarding delays. Any additional time at berth will attract Penal Berth Hire.
- Warping/Shifting may have to be undertaken by the vessel due to operational
reasons for which the vessel agent will have to give a separate request to Port
authorities.
4. Performance Criteria*
- All vessels will adhere to the minimum discharge rates given in the table
below. Any additional time used for discharge will attract Penal Berth Hire.
- If the vessel is not able to utilize the lines when more than 1 pipeline is
offered for discharge, then, Penal Berth Hire will be applicable for the time
that could have been saved as per rates mentioned below.
- If the performance criteria cannot be met due to any preventive or breakdown
maintenance of ETTPLa's facilities, such durations shall not be counted for the
purpose of Performance Criteria. Further, ETTPL shall not be responsible for
any demurrage arising out of the above. However, no Berth Hire Charges
will be applicable during such periods.
Product |
Diameter of
pipeline
offerred |
Average Rates of
discharge |
LPG - Butane |
18" |
400 MT/Hr |
LPG - Propane |
18" |
400 MT/Hr |
HSD |
24" |
900 KL/Hr |
MS |
24" |
700 KL/Hr |
MS |
12" |
400 KL/Hr |
SKO/ATF |
12" |
400 KL/Hr |
Chemicals |
8" |
200 KL/Hr |
Propylene Oxide |
10" |
250 KL/Hr |
CBFS |
24" |
1200 MT/Hr |
Furnace Oil |
24" |
700 MT/Hr |
Lube Oil |
12" |
250 KL/Hr |
- In case the vessel discharges more than 1 parcel/product, then, the
performance criteria as mentioned above shall be calculated on all the
products/parcels together of that vessel and penalty, if any, shall be levied
accordingly.
- Pigging :
- Pigging requests shall not be entertained between 2 grades of the same
product discharged through the same pipeline. If the client insists on
pigging between 2 grades of the same product, it will attract penalty,
payable by the product owner, equivalent to the Penal Berth Hire
charges.
- For tank farms located outside the port boundary, any extra time taken
for pigging resulting in delay of the vessel at the berth will attract
penalty, payable by the product owner, equivalent to the Penal Berth
Hire charges.
5. Penal Berth Hire Charges*
Penal Berth Hire charges shall be levied at 4 times the normal Berth Hire charges
for all the extra time at berth.
6. Preferential/Priority Berthing
The following rules shall be applicable for Preferential/Priority Berthing w.e.f. 1st July 2015 :
- The customer/vessel agent shall have opted for preferential/priority berthing and made a written request 48 hours before arrival of the vessel at the anchorage at Kamarajar Port, to email id : etaettpl@imc.net.in.
- A vessel chartered/owned by ETTPL, its holding company or any of the holding company's subsidiaries will be given preferential berthing..
- All dues to the Port shall have been paid..
- At the time of requesting Preference or Priority Berthing, the customer shall have
paid Preference or Priority Berthing charges, Wharfage, Berth Hire, Pipeline
charges and all other dues with respect to the vessel/product being discharged or
loaded/stored.
- A vessel opting for preferential/priority berthing shall comply with all the conditions stated for "arrived for berthing (FCFS)" at the time of giving notice of arrival.
- If a vessel wishing to opt for preferential/priority berthing has more than 1 customer's parcels, then, all the customers who have parcels for discharge at MLT - ETTPL, shall have agreed for preferential/priority and have paid the relevant charges in advance, as stipulated above.
- Once preferential/priority berthing has been accorded to a vessel, she will be eligible to berth once the vessel at the berth at the time of her arrival, finishes discharging and vacates the berth..
- In case more than 1 vessel opts for preferential/priority berthing, the vessel which opts first will be considered for preferential/priority berthing.
- In any event, a vessel in the queue "arrived for berthing (FCFS)",should not be by-passed more than once during any particular call at the Port. Provided that, in case of possibility of double berthing, the berthing of 2nd vessel shall not be construed as having by-passed other vessels and 50% of priority berthing charges are payable by the second vessel unless the second vessel is next in the queue in which case no priority berthing charges are payable by such vessel.
- This by-pass condition (clause no.9 above) shall not be applicable to vessels which have refused to berth on its turn or has joined a queue again after part discharge.
- ETTPL reserves the right to oust any non-performing vessel as per the criteria laid down in the SOR, after having been accorded priority berthing.
- In case a vessel which has been accorded preferential/priority berthing withdraws its request due to any reason whatsoever, 50% of the Priority Berthing Charges will be levied.
- ETTPL shall have the right to refuse priority berthing without assigning any reason whatsoever.
Preferential/Priority Berthing Charges*
The following Priority Berthing Charges are payable at the time of opting for Preference or Priority Berthing, in addition to the normal charges payable
GT of the vessel |
Priority Berthing Charges |
<10,000 |
2 times Wharfage |
≥10,000 |
1 time Wharfage |
* Note: “ Penal berth hire charges” is put on hold till further notice
7. General
- Vessels shall comply with the provisions of ISGOTT Ship Shore Safety Checklist at all times.
- The vessel's engines and steering gear should be ready for use at any time.
- Vessel shall not be granted permission for immobilization of engines at any time when alongside ETTPL berth.
- The vessel will place a proper gangway / MOT gangway with safety nets to enable safe access to the jetty.
- No repair work will be allowed on the open decks of the tanker at any time when she is alongside.
- Lowering of lifeboats, etc. will not be allowed when alongside.
|